<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Journal Publishing DTD v1.3 20210610//EN" "JATS-journalpublishing1-3.dtd">
<article article-type="research-article" dtd-version="1.3" xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xml:lang="en"><front><journal-meta><journal-id journal-id-type="publisher-id">ejebs</journal-id><journal-title-group><journal-title xml:lang="en">Eurasian Journal of Economic and Business Studies</journal-title><trans-title-group xml:lang="ru"><trans-title>Название журнала на русском</trans-title></trans-title-group></journal-title-group><issn pub-type="ppub">2789-8253</issn><issn pub-type="epub">2789-8261</issn><publisher><publisher-name>University of International Business named after K. Sagadiyev LLP</publisher-name></publisher></journal-meta><article-meta><article-id pub-id-type="doi">10.47703/ejebs.v69i2.507</article-id><article-id custom-type="elpub" pub-id-type="custom">ejebs-19</article-id><article-categories><subj-group subj-group-type="heading"><subject>Research Article</subject></subj-group><subj-group subj-group-type="section-heading" xml:lang="ru"><subject>Статьи</subject></subj-group></article-categories><title-group><article-title>An Assessment of Financial Stability of Artificial Intelligence-based Monitoring Project in Kazakhstan</article-title><trans-title-group xml:lang="ru"><trans-title></trans-title></trans-title-group></title-group><contrib-group><contrib contrib-type="author" corresp="yes"><contrib-id contrib-id-type="orcid">https://orcid.org/0000-0002-6401-2700</contrib-id><name-alternatives><name name-style="western" xml:lang="en"><surname>Narbaev</surname><given-names>Timur</given-names></name></name-alternatives><bio xml:lang="en"><p>PhD, Email: timur.narbaev@gmail.com</p></bio><email xlink:type="simple">timur.narbaev@gmail.com</email><xref ref-type="aff" rid="aff-1"/></contrib><contrib contrib-type="author" corresp="yes"><contrib-id contrib-id-type="orcid">https://orcid.org/0009-0002-7495-9006</contrib-id><name-alternatives><name name-style="western" xml:lang="en"><surname>Aitkhozha</surname><given-names>Bauyrzhan</given-names></name></name-alternatives><bio xml:lang="en"><p>MS, Email: b_aitkhozha@kbtu.kz</p></bio><email xlink:type="simple">b_aitkhozha@kbtu.kz</email><xref ref-type="aff" rid="aff-1"/></contrib><contrib contrib-type="author" corresp="yes"><contrib-id contrib-id-type="orcid">https://orcid.org/0009-0006-0548-4982</contrib-id><name-alternatives><name name-style="western" xml:lang="en"><surname>Samoilov</surname><given-names>Andrey</given-names></name></name-alternatives><bio xml:lang="en"/><email xlink:type="simple">an_samoilov@kbtu.kz</email><xref ref-type="aff" rid="aff-2"/></contrib><contrib contrib-type="author" corresp="yes"><contrib-id contrib-id-type="orcid">https://orcid.org/0000-0001-6820-6644</contrib-id><name-alternatives><name name-style="western" xml:lang="en"><surname>Castelblanco</surname><given-names>Gabriel</given-names></name></name-alternatives><bio xml:lang="en"><p>PhD, Email: gabriel.castelbl@ufl.edu</p></bio><email xlink:type="simple">gabriel.castelbl@ufl.edu</email><xref ref-type="aff" rid="aff-3"/></contrib></contrib-group><aff-alternatives id="aff-1"><aff xml:lang="en">Kazakh-British Technical University, Almaty, Kazakhstan.<country>Kazakhstan</country></aff></aff-alternatives><aff-alternatives id="aff-2"><aff xml:lang="en">Institute of Advanced Research and Sustainable Development, Almaty, Kazakhstan.<country>Kazakhstan</country></aff></aff-alternatives><aff-alternatives id="aff-3"><aff xml:lang="en">University of Florida, Gainesville, USA.<country>United States</country></aff></aff-alternatives><pub-date pub-type="collection"><year>2025</year></pub-date><pub-date pub-type="epub"><day>30</day><month>06</month><year>2025</year></pub-date><volume>69</volume><issue>2</issue><issue-title>Eurasian Journal of Economic and Business Studies</issue-title><elocation-id>95–108</elocation-id><permissions><copyright-statement>Copyright &amp;#x00A9; Narbaev T., Aitkhozha B., Samoilov A., Castelblanco G., 2025</copyright-statement><copyright-year>2025</copyright-year><copyright-holder xml:lang="ru">Narbaev T., Aitkhozha B., Samoilov A., Castelblanco G.</copyright-holder><copyright-holder xml:lang="en">Narbaev T., Aitkhozha B., Samoilov A., Castelblanco G.</copyright-holder><license xml:lang="ru" license-type="creative-commons-attribution" xlink:href="https://creativecommons.org/licenses/by/4.0/" xlink:type="simple"><license-p>Данная работа распространяется под лицензией Creative Commons Attribution 4.0.</license-p></license><license xml:lang="en" license-type="creative-commons-attribution" xlink:href="https://creativecommons.org/licenses/by/4.0/" xlink:type="simple"><license-p>This work is licensed under a Creative Commons Attribution 4.0 License.</license-p></license></permissions><self-uri xlink:href="https://ejebs.uib.kz/jour/article/view/19">https://ejebs.uib.kz/jour/article/view/19</self-uri><abstract><p> </p></abstract><kwd-group xml:lang="en"><kwd>Artificial Intelligence</kwd><kwd>Public-Private Partnerships</kwd><kwd>Digital Business</kwd><kwd>Sergek</kwd><kwd>Financial Stability</kwd><kwd>Project Financing</kwd><kwd>Investment Risk</kwd></kwd-group><funding-group xml:lang="en"><funding-statement>This research was funded by the Science Committee of the Ministry of Science and Higher Education of the Republic of Kazakhstan (grant No. AP23488488).</funding-statement></funding-group></article-meta></front><back><ref-list><title>References</title><ref id="cit1"><label>1</label><citation-alternatives><mixed-citation xml:lang="ru">Benito, J., &amp; Gonzalez-Benito, O. (2005). An analysis of the relationship between environmental motivations and ISO 14001 certification. British Journal of Management, 16(2), 133-148. https://doi.org/10.1111/j.1467-8551.2005.00436.x</mixed-citation><mixed-citation xml:lang="en">Benito, J., &amp; Gonzalez-Benito, O. (2005). An analysis of the relationship between environmental motivations and ISO 14001 certification. British Journal of Management, 16(2), 133-148. https://doi.org/10.1111/j.1467-8551.2005.00436.x</mixed-citation></citation-alternatives></ref><ref id="cit2"><label>2</label><citation-alternatives><mixed-citation xml:lang="ru">Akorda. (2012). Address by the President of the Republic of Kazakhstan, Leader of the Nation N. Nazarbayev – Strategy Kazakhstan 2050: New political course of the established state. Official Website of the President of the Republic of Kazakhstan. Retrieved March 10, 2025 from https://adilet.zan.kz/rus/docs/K1200002050</mixed-citation><mixed-citation xml:lang="en">Akorda. (2012). Address by the President of the Republic of Kazakhstan, Leader of the Nation N. Nazarbayev – Strategy Kazakhstan 2050: New political course of the established state. Official Website of the President of the Republic of Kazakhstan. Retrieved March 10, 2025 from https://adilet.zan.kz/rus/docs/K1200002050</mixed-citation></citation-alternatives></ref><ref id="cit3"><label>3</label><citation-alternatives><mixed-citation xml:lang="ru">Assaf, G., &amp; Assaad, R. H. (2024). A Data-Driven Decision-Support Tool for Selecting the Optimal Project Delivery Method for Bundled Projects: Integrating Machine Learning and Expert Domain Knowledge. Journal of Construction Engineering and Management, 150(12). https://doi.org/10.1061/JCEMD4.COENG-15116</mixed-citation><mixed-citation xml:lang="en">Assaf, G., &amp; Assaad, R. H. (2024). A Data-Driven Decision-Support Tool for Selecting the Optimal Project Delivery Method for Bundled Projects: Integrating Machine Learning and Expert Domain Knowledge. Journal of Construction Engineering and Management, 150(12). https://doi.org/10.1061/JCEMD4.COENG-15116</mixed-citation></citation-alternatives></ref><ref id="cit4"><label>4</label><citation-alternatives><mixed-citation xml:lang="ru">Barlas, Y. (1994). Formal aspects of model validity and validation in system dynamics. System dynamics review, Autumn (Fall). https://doi.org/10.1002/(SICI)1099-1727(199623)12:3%3C183::AID-SDR103%3E3.0.CO;2-4</mixed-citation><mixed-citation xml:lang="en">Barlas, Y. (1994). Formal aspects of model validity and validation in system dynamics. System dynamics review, Autumn (Fall). https://doi.org/10.1002/(SICI)1099-1727(199623)12:3%3C183::AID-SDR103%3E3.0.CO;2-4</mixed-citation></citation-alternatives></ref><ref id="cit5"><label>5</label><citation-alternatives><mixed-citation xml:lang="ru">Bing, L., Akintoye, A., Edwards, P. J., &amp; Hardcastle, C. (2005). The allocation of risk in PPP/PFI construction projects in the UK. International Journal of project management, 23(1), 25-35. https://doi.org/10.1016/j.ijproman.2004.04.006</mixed-citation><mixed-citation xml:lang="en">Bing, L., Akintoye, A., Edwards, P. J., &amp; Hardcastle, C. (2005). The allocation of risk in PPP/PFI construction projects in the UK. International Journal of project management, 23(1), 25-35.   https://doi.org/10.1016/j.ijproman.2004.04.006</mixed-citation></citation-alternatives></ref><ref id="cit6"><label>6</label><citation-alternatives><mixed-citation xml:lang="ru">Biziorek, S., De Marco, A., Guevara, J., &amp; Castelblanco, G. (2023). Enhancing the Public Investment in Public-Private Partnerships Using System Dynamics Modeling. Proceedings - Winter Simulation Conference, 2777–2788. https://doi.org/10.1109/WSC60868.2023.10407708</mixed-citation><mixed-citation xml:lang="en">Biziorek, S., De Marco, A., Guevara, J., &amp; Castelblanco, G. (2023). Enhancing the Public Investment in Public-Private Partnerships Using System Dynamics Modeling. Proceedings - Winter Simulation Conference, 2777–2788.  https://doi.org/10.1109/WSC60868.2023.10407708</mixed-citation></citation-alternatives></ref><ref id="cit7"><label>7</label><citation-alternatives><mixed-citation xml:lang="ru">Castelblanco, G., Narbaev, T., Mamyrbayev, A., Samoilov, A., &amp; Guevara, J. (2024). Improving public investment in Kazakh PPPs from a portfolio perspective: A system dynamics approach. Proceedings of the 44th Eurasia Business and Economics Society Conference, Istanbul 2023 (253-265). Cham: Springer Nature Switzerland. Retrieved March 10, 2025 from https://link.springer.com/chapter/10.1007/978-3-031-69237-6_14</mixed-citation><mixed-citation xml:lang="en">Castelblanco, G., Narbaev, T., Mamyrbayev, A., Samoilov, A., &amp; Guevara, J. (2024). Improving public investment in Kazakh PPPs from a portfolio perspective: A system dynamics approach. Proceedings of the 44th Eurasia Business and Economics Society Conference, Istanbul 2023 (253-265). Cham: Springer Nature Switzerland. Retrieved March 10, 2025 from  https://link.springer.com/chapter/10.1007/978-3-031-69237-6_14</mixed-citation></citation-alternatives></ref><ref id="cit8"><label>8</label><citation-alternatives><mixed-citation xml:lang="ru">Castelblanco, G., Mangano, G., Zenezini, G., &amp; De Marco, A. (2025). Once concessioned, twice shy? Asymmetries of “reconcession” in national PPP programs. Construction Management and Economics, 43(6), 405-427. https://doi.org/10.1080/01446193.2024.2448975</mixed-citation><mixed-citation xml:lang="en">Castelblanco, G., Mangano, G., Zenezini, G., &amp; De Marco, A. (2025). Once concessioned, twice shy? Asymmetries of “reconcession” in national PPP programs. Construction Management and Economics, 43(6), 405-427.  https://doi.org/10.1080/01446193.2024.2448975</mixed-citation></citation-alternatives></ref><ref id="cit9"><label>9</label><citation-alternatives><mixed-citation xml:lang="ru">Chileshe, N., Njau, C. W., Kibichii, B. K., Macharia, L. N., &amp; Kavishe, N. (2022). Critical success factors for Public-Private Partnership (PPP) infrastructure and housing projects in Kenya. International Journal of Construction Management, 22(9), 1606–1617. https://doi.org/10.1080/15623599.2020.1736835</mixed-citation><mixed-citation xml:lang="en">Chileshe, N., Njau, C. W., Kibichii, B. K., Macharia, L. N., &amp; Kavishe, N. (2022). Critical success factors for Public-Private Partnership (PPP) infrastructure and housing projects in Kenya. International Journal of Construction Management, 22(9), 1606–1617.  https://doi.org/10.1080/15623599.2020.1736835</mixed-citation></citation-alternatives></ref><ref id="cit10"><label>10</label><citation-alternatives><mixed-citation xml:lang="ru">De Marco, A., &amp; Narbaev, T. (2021). Factors of Schedule and Cost Performance of Tunnel Construction Megaprojects. The Open Civil Engineering Journal, 15(1), 38-49. https://doi.org/10.2174/1874149502115010038</mixed-citation><mixed-citation xml:lang="en">De Marco, A., &amp; Narbaev, T. (2021). Factors of Schedule and Cost Performance of Tunnel Construction Megaprojects. The Open Civil Engineering Journal, 15(1), 38-49.  https://doi.org/10.2174/1874149502115010038</mixed-citation></citation-alternatives></ref><ref id="cit11"><label>11</label><citation-alternatives><mixed-citation xml:lang="ru">Haraldsson, H. V, &amp; Ab, M. (2004). Introduction to System Thinking and Causal Loop Diagrams. Retrieved March 10, 2025 from www.planteco.lu.se</mixed-citation><mixed-citation xml:lang="en">Haraldsson, H. V, &amp; Ab, M. (2004). Introduction to System Thinking and Causal Loop Diagrams. Retrieved March 10, 2025 from  www.planteco.lu.se</mixed-citation></citation-alternatives></ref><ref id="cit12"><label>12</label><citation-alternatives><mixed-citation xml:lang="ru">Kazakhstan Public-Private Partnership Center. (2025). Project database. Retrieved March 10, 2025 from https://kzppp.kz/en/development-of-ppp-in-kazakhstan/</mixed-citation><mixed-citation xml:lang="en">Kazakhstan Public-Private Partnership Center. (2025). Project database. Retrieved March 10, 2025 from  https://kzppp.kz/en/development-of-ppp-in-kazakhstan/</mixed-citation></citation-alternatives></ref><ref id="cit13"><label>13</label><citation-alternatives><mixed-citation xml:lang="ru">Khallaf, R., Guevara, J., Mendez-Gonzalez, P., &amp; Castelblanco, G. (2024). A System Dynamics Model for a National PPP Program: The Egyptian Project Portfolio. Construction Research Congress 2024, CRC 2024, 3, 507–516. https://doi.org/10.1061/9780784485286.051</mixed-citation><mixed-citation xml:lang="en">Khallaf, R., Guevara, J., Mendez-Gonzalez, P., &amp; Castelblanco, G. (2024). A System Dynamics Model for a National PPP Program: The Egyptian Project Portfolio. Construction Research Congress 2024, CRC 2024, 3, 507–516. https://doi.org/10.1061/9780784485286.051</mixed-citation></citation-alternatives></ref><ref id="cit14"><label>14</label><citation-alternatives><mixed-citation xml:lang="ru">Kozhakhmetova, A., Mamyrbayev, A., Zhidebekkyzy, A., &amp; Bilan, S. (2024). Assessing the impact of artificial intelligence on project efficiency enhancement. Knowledge and Performance Management, 8(2), 109–126. https://doi.org/10.21511/kpm.08(2).2024.09</mixed-citation><mixed-citation xml:lang="en">Kozhakhmetova, A., Mamyrbayev, A., Zhidebekkyzy, A., &amp; Bilan, S. (2024). Assessing the impact of artificial intelligence on project efficiency enhancement. Knowledge and Performance Management, 8(2), 109–126. https://doi.org/10.21511/kpm.08(2).2024.09</mixed-citation></citation-alternatives></ref><ref id="cit15"><label>15</label><citation-alternatives><mixed-citation xml:lang="ru">Levine, S., McCasland, W., &amp; Smalley, D. (1993). Development of a freeway traffic management project through a public-private partnership. 26–31. Retrieved March 10, 2025 from http://onlinepubs.trb.org/Onlinepubs/trr/1993/1394/1394-004.pdf</mixed-citation><mixed-citation xml:lang="en">Levine, S., McCasland, W., &amp; Smalley, D. (1993). Development of a freeway traffic management project through a public-private partnership. 26–31. Retrieved March 10, 2025 from  http://onlinepubs.trb.org/Onlinepubs/trr/1993/1394/1394-004.pdf</mixed-citation></citation-alternatives></ref><ref id="cit16"><label>16</label><citation-alternatives><mixed-citation xml:lang="ru">Mangano, G., Castelblanco, G., De Marco, A., &amp; Ottaviani, F. M. (2025). Exploring the drivers of concession period in transport public–private partnerships. Built Environment Project and Asset Management, 15(2), 193-210. https://doi.org/10.1108/bepam-04-2024-0095</mixed-citation><mixed-citation xml:lang="en">Mangano, G., Castelblanco, G., De Marco, A., &amp; Ottaviani, F. M. (2025). Exploring the drivers of concession period in transport public–private partnerships. Built Environment Project and Asset Management, 15(2), 193-210. https://doi.org/10.1108/bepam-04-2024-0095</mixed-citation></citation-alternatives></ref><ref id="cit17"><label>17</label><citation-alternatives><mixed-citation xml:lang="ru">Mendybayev, B. (2022). Imbalances in Kazakhstan’s Smart Cities Development. Environment and Urbanization ASIA, 13(1), 144–152. https://doi.org/10.1177/09754253221083198</mixed-citation><mixed-citation xml:lang="en">Mendybayev, B. (2022). Imbalances in Kazakhstan’s Smart Cities Development. Environment and Urbanization ASIA, 13(1), 144–152. https://doi.org/10.1177/09754253221083198</mixed-citation></citation-alternatives></ref><ref id="cit18"><label>18</label><citation-alternatives><mixed-citation xml:lang="ru">Mouraviev, N., &amp; Kakabadse, N.K. (2017). Public-private partnerships. Policy and Governance. Challenges Facing Kazakhstan and Russia. Corporate Governance: the International Journal of Business in Society, 14(5), 653 – 669. https://doi.org/10.1108/CG-03-2014-0037</mixed-citation><mixed-citation xml:lang="en">Mouraviev, N., &amp; Kakabadse, N.K. (2017). Public-private partnerships. Policy and Governance. Challenges Facing Kazakhstan and Russia. Corporate Governance: the International Journal of Business in Society, 14(5), 653 – 669.  https://doi.org/10.1108/CG-03-2014-0037</mixed-citation></citation-alternatives></ref><ref id="cit19"><label>19</label><citation-alternatives><mixed-citation xml:lang="ru">Narbaev T., Karimov O., Samoilov A., Ottaviani F. (2025). Success analysis of public-private partnership infrastructure project in Kazakhstan: a case of the big Almaty ring road (BAKAD). Herald of the Kazakh-British technical university, 22(1), 380-391. https://doi.org/10.55452/1998-6688-2025-22-1-380-391</mixed-citation><mixed-citation xml:lang="en">Narbaev T., Karimov O., Samoilov A., Ottaviani F. (2025). Success analysis of public-private partnership infrastructure project in Kazakhstan: a case of the big Almaty ring road (BAKAD). Herald of the Kazakh-British technical university, 22(1), 380-391.  https://doi.org/10.55452/1998-6688-2025-22-1-380-391</mixed-citation></citation-alternatives></ref><ref id="cit20"><label>20</label><citation-alternatives><mixed-citation xml:lang="ru">Narbaev, T. (2022). A meta-analysis of the public-private partnership literature reviews: Exploring the identity of the field. International Journal of Strategic Property Management, 26(4), 318-331. https://doi.org/10.3846/ijspm.2022.17860</mixed-citation><mixed-citation xml:lang="en">Narbaev, T. (2022). A meta-analysis of the public-private partnership literature reviews: Exploring the identity of the field. International Journal of Strategic Property Management, 26(4), 318-331.  https://doi.org/10.3846/ijspm.2022.17860</mixed-citation></citation-alternatives></ref><ref id="cit21"><label>21</label><citation-alternatives><mixed-citation xml:lang="ru">Narbaev, T., &amp; Charman, K. (2017). The formation and management of Public-Private Partnerships in Kazakhstan. Retrieved March 10, 2025 from https://www.researchgate.net/publication/337136999</mixed-citation><mixed-citation xml:lang="en">Narbaev, T., &amp; Charman, K. (2017). The formation and management of Public-Private Partnerships in Kazakhstan. Retrieved March 10, 2025 from  https://www.researchgate.net/publication/337136999</mixed-citation></citation-alternatives></ref><ref id="cit22"><label>22</label><citation-alternatives><mixed-citation xml:lang="ru">Nurbatsin, A., Kireyeva, A., Gamidullaeva, L., &amp; Abdykadyr, T. (2023). Spatial analysis and technological influences on smart city development in Kazakhstan. Journal of Infrastructure, Policy and Development, 8(2). https://doi.org/10.24294/jipd.v8i2.3012</mixed-citation><mixed-citation xml:lang="en">Nurbatsin, A., Kireyeva, A., Gamidullaeva, L., &amp; Abdykadyr, T. (2023). Spatial analysis and technological influences on smart city development in Kazakhstan. Journal of Infrastructure, Policy and Development, 8(2). https://doi.org/10.24294/jipd.v8i2.3012</mixed-citation></citation-alternatives></ref><ref id="cit23"><label>23</label><citation-alternatives><mixed-citation xml:lang="ru">Osei-Kyei, R., Jin, X., Nnaji, C., Akomea-Frimpong, I., &amp; Wuni, I. Y. (2023). Review of risk management studies in public-private partnerships: A scientometric analysis. International Journal of Construction Management, 23(14), 2419-2430. https://doi.org/10.1080/15623599.2022.2063013</mixed-citation><mixed-citation xml:lang="en">Osei-Kyei, R., Jin, X., Nnaji, C., Akomea-Frimpong, I., &amp; Wuni, I. Y. (2023). Review of risk management studies in public-private partnerships: A scientometric analysis. International Journal of Construction Management, 23(14), 2419-2430.  https://doi.org/10.1080/15623599.2022.2063013</mixed-citation></citation-alternatives></ref><ref id="cit24"><label>24</label><citation-alternatives><mixed-citation xml:lang="ru">Saltelli, A., Tarantola, S., Campolongo, F., &amp; Ratto, M. (2004). Sensitivity Analysis in Practice: A Guide to Assessing Scientific Models. John Wiley &amp; Sons. http://dx.doi.org/10.1002/0470870958</mixed-citation><mixed-citation xml:lang="en">Saltelli, A., Tarantola, S., Campolongo, F., &amp; Ratto, M. (2004). Sensitivity Analysis in Practice: A Guide to Assessing Scientific Models. John Wiley &amp; Sons.  http://dx.doi.org/10.1002/0470870958</mixed-citation></citation-alternatives></ref><ref id="cit25"><label>25</label><citation-alternatives><mixed-citation xml:lang="ru">Samoilov, A., Narbaev, T., Castelblanco, G., &amp; Mukashev, Y. (2024a). Evaluating Public-Private Partnership Dynamics: the Kazakhstan Toll Road Case. Eurasian Journal of Economic and Business Studies, 68(1), 131–142. https://doi.org/10.47703/ejebs.v68i1.374</mixed-citation><mixed-citation xml:lang="en">Samoilov, A., Narbaev, T., Castelblanco, G., &amp; Mukashev, Y. (2024a). Evaluating Public-Private Partnership Dynamics: the Kazakhstan Toll Road Case. Eurasian Journal of Economic and Business Studies, 68(1), 131–142.  https://doi.org/10.47703/ejebs.v68i1.374</mixed-citation></citation-alternatives></ref><ref id="cit26"><label>26</label><citation-alternatives><mixed-citation xml:lang="ru">Samoilov, A., Osei-Kyei, R., Kussaiyn, M., Mamyrbayev, A., &amp; Mukashev, Y. (2024b). Cross-Country Comparison of Risk Factors in Public–Private Partnerships in Infrastructure Development: Evidence from Colombia, Kazakhstan, and Ghana. Sustainability (Switzerland), 16(13), 5712. https://doi.org/10.3390/su16135712</mixed-citation><mixed-citation xml:lang="en">Samoilov, A., Osei-Kyei, R., Kussaiyn, M., Mamyrbayev, A., &amp; Mukashev, Y. (2024b). Cross-Country Comparison of Risk Factors in Public–Private Partnerships in Infrastructure Development: Evidence from Colombia, Kazakhstan, and Ghana. Sustainability (Switzerland), 16(13), 5712.  https://doi.org/10.3390/su16135712</mixed-citation></citation-alternatives></ref><ref id="cit27"><label>27</label><citation-alternatives><mixed-citation xml:lang="ru">Sterman, J. (2000). Business Dynamics: System Thinking and Modeling for a Complex World. McGraw-Hill Europe. Retrieved March 10, 2025 from https://industri.fatek.unpatti.ac.id/wp-content/uploads/2019/03/007-Business-Dynamics-Systems-Thinking-and-Modeling-for-a-Complex-World-John-D.-Sterman-Edisi-1-2000.pdf</mixed-citation><mixed-citation xml:lang="en">Sterman, J. (2000). Business Dynamics: System Thinking and Modeling for a Complex World. McGraw-Hill Europe. Retrieved March 10, 2025 from https://industri.fatek.unpatti.ac.id/wp-content/uploads/2019/03/007-Business-Dynamics-Systems-Thinking-and-Modeling-for-a-Complex-World-John-D.-Sterman-Edisi-1-2000.pdf</mixed-citation></citation-alternatives></ref><ref id="cit28"><label>28</label><citation-alternatives><mixed-citation xml:lang="ru">Turner, S. M. (1995). Advanced techniques for travel time data collection. Pacific Rim TransTech Conference. 1995 Vehicle Navigation and Information Systems Conference Proceedings. 6th International VNIS. A Ride into the Future, 40–47. https://doi.org/10.1109/VNIS.1995.518816</mixed-citation><mixed-citation xml:lang="en">Turner, S. M. (1995). Advanced techniques for travel time data collection. Pacific Rim TransTech Conference. 1995 Vehicle Navigation and Information Systems Conference Proceedings. 6th International VNIS. A Ride into the Future, 40–47. https://doi.org/10.1109/VNIS.1995.518816</mixed-citation></citation-alternatives></ref><ref id="cit29"><label>29</label><citation-alternatives><mixed-citation xml:lang="ru">Wibowo, A. (2024). Ex ante required rates of return and related factors in Indonesian PPP infrastructure projects. Built Environment Project and Asset Management, 14(2), 228-243. https://doi.org/10.1108/BEPAM-06-2023-0113</mixed-citation><mixed-citation xml:lang="en">Wibowo, A. (2024). Ex ante required rates of return and related factors in Indonesian PPP infrastructure projects. Built Environment Project and Asset Management, 14(2), 228-243.  https://doi.org/10.1108/BEPAM-06-2023-0113</mixed-citation></citation-alternatives></ref><ref id="cit30"><label>30</label><citation-alternatives><mixed-citation xml:lang="ru">Xu, Y., Sun, C., Skibniewski, M. J., Chan, A. P. C., Yeung, J. F. Y., &amp; Cheng, H. (2012). System Dynamics (SD)-based concession pricing model for PPP highway projects. International Journal of Project Management, 30(2), 240–251. https://doi.org/10.1016/j.ijproman.2011.06.001</mixed-citation><mixed-citation xml:lang="en">Xu, Y., Sun, C., Skibniewski, M. J., Chan, A. P. C., Yeung, J. F. Y., &amp; Cheng, H. (2012). System Dynamics (SD)-based concession pricing model for PPP highway projects. International Journal of Project Management, 30(2), 240–251.  https://doi.org/10.1016/j.ijproman.2011.06.001</mixed-citation></citation-alternatives></ref></ref-list><fn-group><fn fn-type="conflict"><p>The authors declare that there are no conflicts of interest present.</p></fn></fn-group></back></article>
